Title: Transfer and development length of high-strength duplex stainless steel strand in prestressed concrete piles
Date Published: May-June 2017
Volume: 62
Issue: 3
Page Numbers: 59-71
Authors: Alvaro Paul, Lorintz B. Gleich, and Lawrence F. Kahn
https://doi.org/10.15554/pcij62.3-01

Click here to view the full journal article.

Abstract

With increasing demand for bridge service lives of 100 years or more, engineers face a durability challenge regarding bridges in coastal regions, where accelerated deterioration is commonly observed. To develop more-durable reinforcement, this research assesses the bond performance of duplex high-strength stainless steel (HSSS) 2205 strand in prestressed concrete piles by the experimental determination of the transfer and development length. The average transfer length of piles reinforced with duplex HSSS 2205 strand was 74% and 57% of the transfer length calculated based on ACI 318-14 and AASHTO LRFD specification requirements, respectively. In addition, driving the piles to refusal had little effect on the transfer length. The experimental development length of piles using duplex HSSS 2205 strand was 88% and 55% of the transfer length calculated based on ACI 318-14 and AASHTO LRFD specifications requirements, respectively. These results suggest that the current codes may be used without modifications for design with duplex HSSS 2205 strand.

References

1. Aïtcin, P. C. 2003. “The Durability Characteristics of High Performance Concrete: A Review.” Cement and Concrete Composites 25 (4): 409–420.

2. Mehta, P. K. 1991. Concrete in the Marine Environment. New York, NY: Elsevier Science Publishers Ltd.

3. Azzinamini, A., E. Power, G. Myers, H. Ozyildirim, E. Kline, D. Whitmore, and D. Mertz. 2013. Design Guide for Bridges for Service Life. Washington, DC: National Academy of Sciences.

4. Moser, R., P. Singh, L. Kahn, P. Singh, and K. Kurtis. 2011. Durability of Precast Prestressed Concrete Piles in Marine Environment: Reinforcement Corrosion and Mitigation, Part 1. GDOT (Georgia Department of Transportation) research project no. 07-30. Atlanta, GA: GDOT.

5. Kurtis, K. E., L. F. Kahn, and E. Nadelman. 2013. Viability of Concrete Performance-Based Specification for Georgia DOT Projects. Atlanta, GA: GDOT.

6. ASTM International Committee A01. 2016. Standard Specification for Stainless Steel Bars and Shapes. ASTM A276/A276M-16a. West Conshohocken, PA: ASTM International.

7. Moser, R., P. Singh, L. Kahn, and K. Kurtis. 2012. Durability of Precast Prestressed Concrete Piles in Marine Environment, Part 2, Volume 2: Stainless Steel Prestressing Strand and Wire. FHWAGA- 12-1026. Atlanta, GA: GDOT.

8. Hartt, W. H., R. G. Powers, D. K. Lysogorski, V. Liroux, and Y. P. Virmani. 2007. Corrosion Resistant Alloys for Reinforced Concrete. FHWA-HRT-07-039. Washington, DC: FHWA (Federal Highway Administration).

9. Schuetz, D., L. Kahn, K. Kurtis, P. Singh, and R. Moser. 2012. “Preliminary Studies of the Mechanical Behavior of High-Strength Stainless Steel Prestressing Strands.” Paper 70. In 2012 PCI Convention and National Bridge Conference September 29–October 2, 2012, Nashville, Tennessee, Proceedings Disc. Chicago, IL: PCI. CD-ROM.

10. ACI (American Concrete Institute) Committee 318. 2014. Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14). Farmington Hills, MI: ACI.

11. AASHTO (American Association of State Highway and Transportation Officials). 2013. AASHTO LRFD Bridge Design Specifications. 6th ed. Washington, DC: AASHTO.

12. ASTM International Committee A01. 2015. Standard Guide for Specifying Harmonized Standard Grade Compositions for Wrought Carbon, Low-Alloy, and Alloy Steels. ASTM A1040-10(2015)e1. West Conshohocken, PA: ASTM International.

13. ASTM International Committee G01. 2014. Standard Test Method for Conducting Cyclic Potentiodynamic Polarization Measurements for Localized Corrosion Susceptibility of Iron-, Nickel-, or Cobalt-Based Alloys. ASTM G61-86(2014). West Conshohocken, PA: ASTM International.

14. ASTM International Committee A01. 2016. Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete. ASTM A1064/A1064M-16b. West Conshohocken, PA: ASTM International.

15. Russell, B. W., and N. H. Burns. 1993. Design Guidelines for Transfer, Development and Debonding of Large Diameter Seven Wire Strands in Prestressed Concrete Girders. FHWA/TX-93+1210-5F. Austin, TX: Texas Department of Transportation.

16. Meyer, K. F. 2002. “Transfer and Development Length of 0.6-inch Diameter Prestressing Strand in High Strength Lightweight Concrete.” PhD diss., Georgia Institute of Technology, Atlanta, GA.

17. Buckner, C. D. 1995. “A Review of Strand Development Length for Pretensioned Concrete Members.” PCI Journal 40 (2): 84–105.

18. Dill, J. C. 2000. “Development Length of 0.6-inch Diameter Prestressing Strand in High Performance Concrete.” MSc diss., Georgia Institute of Technology, Atlanta, GA.

19. Kahn, L. F., J. C. Dill, and C. G. Reutlinger. 2002. “Transfer and Development Length of 15-mm Strand in High Performance Concrete Girders.” Journal of Structural Engineering 128 (7): 913–921.

20. Oh, B. H., and E. S. Kim. 2000. “Realistic Evaluation of Transfer Lengths in Pretensioned, Prestressed Concrete Members.” ACI Materials Journal 97 (6): 821–830.

21. Oh, B. H., E. S. Kim, and Y. C. Choi. 2006. “Theoretical Analysis of Transfer Lengths in Pretensioned Prestressed Concrete Members.” Journal of Engineering Mechanics 132 (10): 1057–1066.

22. Zia, P., and T. Mostafa. 1977. “Development Length of Prestressing Strands.” PCI Journal 22 (5): 54–65.

23. Martin, L. D., and N. L. Scott. 1976. “Development of Prestressing Strand in Pretensioned Members.” ACI Journal 73 (8): 453–456.

24. Deatherage, J. H., E. G. Burdette, and C. K. Chew. 1994. “Development Length and Lateral Spacing Requirements of Prestressing Strand for Prestressed Concrete Bridge Girders.” PCI Journal 39 (1): 70–83.

25. Mitchell, D., W. D. Cook, A. A. Khan, and T. Tham. 1993. “Influence of High Strength Concrete on Transfer and Development Length of Pretensioning Strand.” PCI Journal 38 (3): 52–66.

26. Lane, S. N. 1998. A New Development Length Equation for Pretensioned Strands in Bridge Beams and Piles. FHWA-RD-98-116. Washington, DC: FHWA.

27. Ramirez, J. A., and B. W. Russell. 2008. Transfer, Development, and Splice Length for Strand/ Reinforcement in High-Strength Concrete. National Cooperative Highway Research Project report 603. Washington, DC: Transportation Research Board.

28. Barnes, R. W., J. W. Grove, and N. H. Burns. 2003. “Experimental Assessment of Factors Affecting Transfer Length.” ACI Structural Journal 100 (6): 740–748.

29. Kaar, P. H., R. W. LaFraugh, and M. A. Mass. 1963. “Influence of Concrete Strength on Strand Transfer Length.” PCI Journal 8 (5): 47–67.

30. Russell, B. W., and N. H. Burns. 1997. “Measurement of Transfer Lengths on Pretensioned Concrete Elements.” Journal of Structural Engineering 123 (5): 541–549.