Title: Central Artery/Tunnel Project: Standardized Precast, Prestressed Transition Structures
Date: January-February, 2001
Volume: 46
Issue: 1
Page number: 22-27
Author(s): Jennifer Hill, Ru-Chu Hsu, Vijay Chandra
https://doi.org/10.15554/pcij.01012001.22.27
Click here to access the full journal article
Abstract
Precast, prestressed concrete has played a prominent role in the design and construction of Boston’s Central Artery/Tunnel Project. The previous four articles have shown the many innovative ways in which precast concrete products have been used in this project. In this Part 5 article, the authors discuss the use of standardized precast, prestressed transition structures, especially the slab-on-pile and the New England bulb-T girder.