There was a problem loading this area.
Awards 
2013 PCI Design AwardsDesign Award Honorable Mention: Bridges with Main Span More Than 150 Feet (46 m) Award
Project Team

Engineer

PB, Lawrenceville, N.J.

Contractor

Agate Construction Co., Ocean View, N.J.

Owner

New Jersey Turnpike Authority, Woodbridge, N.J.

Precaster

Precast Systems, Allentown, N.J.

Precast Specialty Engineer

Freyssinet, Sterling, Va.

Key Project Attributes

  • Precast concrete design cost $5.1 million less than a comparable steel option.
  • Resulted in high performance structure
  • Reduced footprint within the waterway
  • Resiliency of precast was important for this structure due to its location

Project/Precast Scope

  • Features 1,230 feet (375 m) of precast concrete
  • Span lengths were maximized to 220 feet (67 m)
  • Three 8 feet (2.4 m) diameter drill shafts that extend over 150 feet (46 m)
  • Seven prestressed concrete spliced girders sitting on pier caps
  • Took six months to be completed