When Orange County decided to build a new building as part of the OC Civic Center in Santa Ana, Calif., they wanted it to be more than just another office center. The owner saw the building as an opportunity to enhance the community, says Deryl Robinson, vice president, senior program and construction manager, for Griffin Structures. It was the first building Orange County had built in 40 years, and they wanted it to reflect the elegant local architecture, which was dominated by a 120-year-old historic courthouse clad in natural sandstone.

“Our team’s challenge was to design and construct a building that combined high quality, durability, and a long life with minimal maintenance,” Robinson says. From the outset, the primary design objective was to create a beautiful and resilient building that would be efficient and operational for generations to come. The designers chose precast concrete because they knew it would deliver the desired durability and timeless appearance that the client was seeking—while staying within their budget.

The final $162 million design features a six-story office building on top of two levels of underground parking, with a freestanding 7,200 ft² conference center. The owner originally wanted the feature walls to be made of sandstone to match the courthouse; however, that wasn’t a cost-effective option, says the project’s architect, Melody Tang of LPA Design Studios. Instead, the design team elected to construct the feature walls out of colored precast concrete that was designed to exactly match the color of the sandstone while also meeting other project goals. “The ability to seamlessly blend freestanding architectural precast concrete walls around the site and ground floor with an efficient, lightweight, thin precast concrete shell was critical in achieving the overall design aesthetic,” Tang says.

Insulated Skin

The design team reviewed many material samples with the precast concrete fabricator before finding the right match for the project. The final solution features an integral colored precast concrete to emulate the rich red color of the historic sandstone, and thoughtful detailing of mitered corners and full returns of the panels gives the precast concrete the appearance of natural stone.

“This accomplishment was made possible thanks to close collaboration between the construction manager, the precast concrete producer, and the architect,” Tang says. Weekly meetings throughout the course of construction ensured that aesthetic goals were met while taking into consideration logistical challenges of casting the panels at the plant, transporting them to the site, and installing and aligning them in the field.

To enhance the energy efficiency of the design, spray foam insulation was applied to the thin-shell precast concrete at the plant. Attaching insulation directly to the skin of the panel minimized heat transfer between the exterior and interior of the building,” says Jeremy Hart, director of civic and cultural design for LPA Design Studios. That helped the building receive a LEED Silver rating and reduced its projected energy use from the baseline standard by 76%. “An efficient building skin was critical to the ability to achieve performance goals established by the owner and design team,” says Hart.

Because the building is built in an active seismic zone, its lateral resisting system is a buckling-restrained braced frame structure (BRBF), which allows the building to move as necessary and remain operational after a seismic event. To accommodate the movement allowed by the BRBF system, careful consideration was given to the precast concrete panels’ movement joints to ensure they could move with the frame in an earthquake but would not detract from the overall design aesthetic.

Finally, the use of precast concrete mitigated construction challenges in the busy urban setting, allowing the project to be completed five months ahead of schedule. “We and our client love the fact that we were able to achieve a natural look and feel in our building’s exterior envelope, while still adhering to budget realities,” says Robinson. “The client is extremely pleased with the outcome.”

 

Awards_
2021 PCI Design AwardsSpecial Award: Sustainable Design
Project Team

Owner:

Orange County, Santa Ana, Calif.

PCI-Certified Precast Concrete Producer:

Willis Construction, San Juan Bautista, Calif.

Architect and Engineer of Record:

LPA Design Studios, Irvine, Calif.

General Contractor:

Swinerton Builders, Santa Ana, Calif.

Project Developer:

Griffin Structures, Inc., Irvine, Calif.

Photo Credit:

LPA, Inc.
RMA Photography
LPA Design Studios/Costea Photography

Project cost:

$162 million

Project size:

250,000 ft²

Key Project Attributes

  • Integral colored precast concrete emulates the rich red color of historic sandstone.
  • Spray foam insulation applied to thin shell precast concrete at the plant enhances energy efficiency.
  • The project was completed five months ahead of schedule.

Project/Precast Scope

  • Build a six-story office building and freestanding conference center above a two-level underground parking garage.
  • The project features 306 precast concrete panels.
  • The project was completed in two years.