Title: Spacing requirements of 0.7 in. (18 mm) diameter prestressing strands
Date Published: January-February 2016
Volume: 61
Issue: 1
Page Number: 70-87
Author(s): Canh N. Dang, Royce W. Floyd, W. Micah Hale, and J. R. Martí-Vargas
https://doi.org/10.15554/pcij.01012016.70-87
Click here to access the full journal article
Abstract
The use of 0.7 in. (18 mm) diameter strands for pretensioned concrete girders is advantageous when increasing the flexural capacity and extending girder spans. The current codes have no design guidelines for predicting transfer length, development length, and minimum strand spacing for this greater-diameter strand. This study measures transfer and development lengths and evaluates the applicability of using a strand spacing of 2.0 in. (51 mm) for 16 pretensioned concrete beams with 0.7 in. diameter strands. These beams were fabricated with high-strength, conventional concrete or self-consolidating concrete. The Standard Test Method for Evaluating Bond of Seven-Wire Steel Prestressing Strand (ASTM A1081) was used to quantify the strand surface conditions. The experimental results indicate that the current ACI 318-14 and AASHTO LRFD specifications overestimate the measured transfer and development lengths for the beams. Transfer and development lengths of the beams containing two strands placed at 2.0 in. spacing were equal to or slightly greater than those of the beams containing one strand. Finally, the concrete region around the strands showed no sign of cracking.
References
Cousins, T. E., J. M. Stallings, and M. B. Simmons. 1994. “Reduced Strand Spacing in Pretensioned, Prestressed Members.” ACI Structural Journal 91 (3): 277–286.
Dang, C. N., C. D. Murray, R. W. Floyd, W. Micah Hale, and J. R. Martí-Vargas. 2015 “Bond Stress-Slip Model for 0.6 in. (15.2 mm) Diameter Strand.” ACI Structural Journal 112 (05): 625–634.
Russell, B. W., and N. H. Burns. 1993. “Design Guidelines for Transfer, Development and Debonding of Large Diameter Seven Wire Strands in Pretensioned Concrete Girders.” FHWA/TX-93+1210-5F. Alexandria, VA: National Technical Information Service.
Morcous, G., S. Assad, A. Hatami, and M. K. Tadros. 2014. “Implementation of 0.7 in. Diameter Strands at 2.0 × 2.0 in. Spacing in Pretensioned Bridge Girders.” PCI Journal 59 (3): 145–158.
ACI (American Concrete Institute) Committee 318. 1963. Building Code Requirements for Structural Concrete (ACI 318-63) and Commentary (ACI 318R-63). Detroit, MI: ACI.
Buckner, C. D. 1995. “A Review of Strand Development Length for Pretensioned Concrete Members.” PCI Journal 40 (2): 84–99.
Lane, S., and D. Rekenthaler Jr. 1998. “The Ties that Bind: The 10-Year Fight for 0.6-inch Diameter Strands.” Public Roads 61 (5): 27–29.
ACI Committee 318. 2014. Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14). Farmington Hills, MI: ACI.
AASHTO (American Association of State Highway and Transportation Officials). 2012. AASHTO LRFD Bridge Design Specifications. 6th ed. Washington, DC: AASHTO.
Deatherage, J. H., E. G. Burdette, and C. K. Chew. 1994. “Development Length and Lateral Spacing Requirements of Prestressing Strand for Prestressed Concrete Bridge Girders.” PCI Journal 39 (1): 70–83.
Russell, B. W., and N. H. Burns. 1996. “Measured Transfer Lengths of 0.5 and 0.6 in. Strands in Pretensioned Concrete.” PCI Journal 41 (5): 44–65.
Russell, B. W., and N. Burns. 1997. “Measurement of Transfer Lengths on Pretensioned Concrete Elements.” Journal of Structural Engineering 123 (5): 541–549.
Shahawy, M. A., M. Issa, and B. Batchelor. 1992. “Strand Transfer Lengths in Full Scale AASHTO Prestressed Concrete Girders.” PCI Journal 37 (3): 84–96.
Gross, S. P., and N. H. Burns. 1995. “Transfer and Development Length of 15.2 mm (0.6 in.) Diameter Prestressing Strand in High Performance Concrete: Results of the Hoblitzell-Buckner Beam Tests.” FHWA/TX-97/580-2. Austin, TX: Texas Department of Transportation.
Barnes, R. W., N. H. Burns, and M. E. Kreger. 1999. “Development Length of 0.6-inch Prestressing Strand in Standard I-Shaped Pretensioned Concrete Beams.” FHWA/TX-02/1388-1. Austin, TX: Texas Department of Transportation.
Kose, M. M., and W. R. Burkett. 2005. “Evaluation of Code Requirement for 0.6 in. (15 mm) Prestressing Strand.” ACI Structural Journal 102 (3): 422–428.
Andrawes, B., A. Pozolo, and Z. Chen. 2011. “Development Length Tests of Full-Scale Prestressed Self-Consolidating Concrete Box and I-Girders.” Journal of Bridge Engineering 18 (11): 1209–1218.
Morcous, G., A. Hatami, M. Maguire, K. Hanna, and M. Tadros. 2012. “Mechanical and Bond Properties of 18-mm- (0.7-in.-) Diameter Prestressing Strands.” Journal of Materials in Civil Engineering 24 (6): 735–744.
Hatami, A., G. Morcous, K. E. Hanna, and M. K. Tadros. 2011. “Evaluating the Bond of 0.7-in. Diameter Prestressing Strands for Concrete Bridge Girders.” Transportation Research Record 11-2104: 1–13.
Dang, C. N., C. D. Murray, R. W. Floyd, W. Micah Hale, and J. R. Martí-Vargas. 2014. “Analysis of Bond Stress Distribution for Prestressing Strand by Standard Test for Strand Bond.” Engineering Structures, no. 72: 152–159.
Morcous, G., K. Hanna, and M. K. Tadros. 2011. “Impact of 0.7 inch Diameter Strands on NU I-Girders.” SPR-1(08) P311. Lincoln, NE: Nebraska Department of Roads.
Morcous, G., K. Hanna, and M. K. Tadros. 2011. “Use of 0.7-in.-Diameter Strands in Pretensioned Bridge Girders.” PCI Journal 56 (4): 65–82.
Patzlaff, Q., G. Morcous, K. Hanna, and M. Tadros. 2012. “Bottom Flange Confinement Reinforcement in Precast Prestressed Concrete Bridge Girders.” Journal of Bridge Engineering 17 (4): 607–616.
Song, W., Z. J. Ma, J. Vadivelu, and E. G. Burdette. 2013. “Transfer Length and Splitting Force Calculation for Pretensioned Concrete Girders with High-Capacity Strands.” Journal of Bridge Engineering 19 (7): 1–8.
Maguire, M., G. Morcous, and M. Tadros. 2013. “Structural Performance of Precast/Prestressed Bridge Double-Tee Girders Made of High-Strength Concrete, Welded Wire Reinforcement, and 18-mm-Diameter Strands.” Journal of Bridge Engineering 18 (10): 1053–1061.
Arab, A. A. 2012. “Finite Element Modeling of Pretensioned Concrete Girders: A Methodological Approach with Applications in Large Strands and End Zone Cracking.” PhD diss., George Washington University, Washington, DC.
Russell, H., J. Volz, and R. N. Bruce. 1997. “Optimized Sections for High-Strength Concrete Bridge Girders.” FHWA-RD-95-180. Washington, DC: Federal Highway Administration.
Bymaster, J. C., C. N. Dang, R. W. Floyd, and W. M. Hale. 2015. “Prestress Losses in Pretensioned Concrete Beams Cast with Lightweight Self-Consolidating Concrete.” Structures ## (2): 50–57.
ASTM Subcommittee C09.47. 2014. Standard Test Method for Slump Flow of Self-Consolidating Concrete. C1611/C1611M-06. West Conshohocken, PA: ASTM International.
ASTM Subcommittee C09.47. 2014. Standard Test Method for Passing Ability of Self-Consolidating Concrete by J-Ring. ASTM C1621/C1621M-14. West Conshohocken, PA: ASTM International.
Khayat, K., and D. Mitchell. 2009. “Self-Consolidating Concrete for Precast, Prestressed Concrete Bridge Elements.” NCHRP (National Cooperative Highway Research Project) report 628. Washington, DC: Transportation Research Board.
Dang, C. N., C. D. Murray, R. W. Floyd, W. Micah Hale, and J. R. Martí-Vargas. 2014. “A Correlation of Strand Surface Quality to Transfer Length.” ACI Structural Journal 111 (5): 1245–1252.
Ramirez, J. A., and B. W. Russell. 2008. “Transfer, Development, and Splice Length for Strand/Reinforcement in High Strength Concrete.” NCHRP report 603. Washington, DC: Transportation Research Board.
ASTM Subcommittee A01.05., 2012. Standard Test Method for Evaluating Bond of Seven-Wire Steel Prestressing Strand. ASTM A1081/A1081M-12. West Conshohocken, PA: ASTM International.
Staton, B. W., N. H. Do, E. D. Ruiz, and W. M. Hale. 2009. “Transfer Lengths of Prestressed Beams Cast with Self-consolidating Concrete.” PCI Journal 54 (2): 64–83.
Floyd, R. W., M. B. Howland, and W. Micah Hale. 2011. “Evaluation of Strand Bond Equations for Prestressed Members Cast with Self-Consolidating Concrete.” Engineering Structures 33 (10): 2879–2887.
Dang, C. 2015. “Measurement of Transfer and Development Lengths of 0.7 in. Strands on Pretensioned Concrete Elements.” PhD diss., University of Arkansas, Fayetteville, AR.
Carroll, J. C. 2009. “Grade 300 Prestressing Strand and the Effect of Vertical Casting Position.” PhD diss., Virginia Polytechnic Institute and State University, Blacksburg, VA.
Maguire, M. 2009. “Impact of 0.7 inch Diameter Prestressing Strands in Bridge Girders.” MS thesis, University of Nebraska–Lincoln.
Patzlaff, Q. 2010. “Impact of Bottom Flange Confinement Reinforcement on Performance of Prestressed Concrete Bridge Girders.” MS thesis, University of Nebraska–Lincoln.
Morcous, G., S. Asaad, and A. Hatami. 2013. “Implementation of 0.7 in. Diameter Strands in Prestressed Concrete Girders.” SPR-P1(13) M333. Lincoln, NE: Nebraska Department of Roads.
Unay, I. O., B. Russell, N. Burns, and M. Kreger. “Measurement of Transfer Length on Prestressing Strands in Prestressed Concrete Specimens.” FHWA/TX-91+1210-1. Austin, TX: Texas Department of Transportation.
Barnes, R. W., J. W. Grove, and N. H. Burns. 2003. “Experimental Assessment of Factors Affecting Transfer Length.” ACI Structural Journal 100 (6): 740–748.
Jiang, X. 2013. “Bond Performance of High-Capacity Strands in High Strength Concrete.” PhD diss., University of Tennessee–Knoxville, Knoxville, TN.
Shahawy, M. 2001. “A Critical Evaluation of the AASHTO Provisions for Strand Development Length of Prestressed Concrete Members.” PCI Journal 46 (4): 94-117.