Guidelines
Bridge Guideline: May 2020
Updated Design Guidelines for Full Depth Precast Deck Panels used for new or replacement construction of existing decks on bridges. The updated guidelines included using connections (UHPC or normal strength concrete), Post-Tensioning and Horizontal Deck Panel layouts. This guideline has been developed and approved by the Northeast Bridge Technical committee. Several projects have already used these guidelines. If a State Standard exists it will take precedence.
Bridge Guideline: February 2017
Guidelines and details for Precast Prestressed Concrete Deck Panels or Stay-in-Place (SIP) decking used as a permanent form spanning between girders and designed to act composite with the remaining cast-in-place deck. If a State Standard exists it will take precedence over these guidelines & details.