Guidelines
Bridge Guideline: December 2014
This guide (second edition) is the current State-of-the-Art report developed by the PCI Northeast Bridge Technical Committee on the use of Precast/Prestressed Concrete Components to accelerate the construction of bridge projects. The guide will assist designers in determining which means and methods would be appropriate for considering accelerated construction techniques.
This guide will offer solutions from deck replacement to total reconstruction of a bridge.
Bridge Guideline: May 2013
This guide is the current State of the Art report developed by the PCI Northeast Bridge Technical Committee. The guide details use Precast Concrete Components for precast approach slabs to accelerate the construction of bridge projects.
Bridge Guideline: May 2013
This guide is the current State of the Art report developed by the PCI Northeast Bridge Technical Committee. The guide details use Precast Concrete Components for substructures to accelerate the construction of bridge projects. The guide details will assist designers in determining the appropriate solution for precast substructures in design and construction.