Guidelines

Bridge Guideline: December 2014

Guidelines for Accelerated Bridge Construction Using Precast/Prestressed Concrete Components Including Guideline Details, Second Edition. (7.2 mb PDF File)

This guide (second edition) is the current State-of-the-Art report developed by the PCI Northeast Bridge Technical Committee on the use of Precast/Prestressed Concrete Components to accelerate the construction of bridge projects. The guide will assist designers in determining which means and methods would be appropriate for considering accelerated construction techniques.
This guide will offer solutions from deck replacement to total reconstruction of a bridge.

Bridge Guideline: November 2012

Guideline for Precast Approach Slabs (1.9 mb PDF File)

This guide is the current State of the Art report developed by the PCI Northeast Bridge Technical Committee. The guide details use Precast Concrete Components for precast approach slabs to accelerate the construction of bridge projects.

Bridge Guideline: June 2012

Guideline Details for Precast Concrete Substructures (7.07mb PDF File)

This guide is the current State of the Art report developed by the PCI Northeast Bridge Technical Committee. The guide details use Precast Concrete Components for substructures to accelerate the construction of bridge projects. The guide details will assist designers in determining the appropriate solution for precast substructures in design and construction.

Other Links

Aspire The Concrete Bridge Magazine

Link to the Aspire Bridge Magazine web site

 

Federal Highway Administration

Link to the U.S. Department of Transportation Federal Highway Administration

{{vm.settings.Title}}

{{vm.settings.Subtitle}}

Lime Kiln Bridge (ASPIRE)
(Adobe PDF File)
Elliot Road Overpass
(Adobe PDF File)
Sibley Pond Bridge
(Adobe PDF File)
Sibley Pond Bridge Paper 39
(Adobe PDF File)
York River Bridge
(Adobe PDF File)
PCI Sibley Donington
(Adobe PDF File)