Project Overview

Riddle Memorial Hospital undertook a campus-wide master planning initiative to address patient parking demands while enhancing the overall environment of its Media, Pennsylvania campus. Tim Haahs & Associates worked with the hospital to produce a comprehensive plan encompassing full architectural documentation, structural engineering, lighting design, and MEP services. The resulting three-level, 440-space precast/prestressed concrete parking structure maximizes available land through effective column spacing and ideal floor-to-floor heights, connecting directly to the medical facility via a pedestrian bridge.

Precast Solution 

Sustainability was a defining priority of the project. The design team incorporated fly ash concrete, regionally sourced materials, and Low-E glazing in the prominent glass stair towers to reduce the structure's environmental footprint. These measures, combined with the inherent ecoSmart characteristics of precast/prestressed concrete, contributed LEED points to the hospital campus. The exterior treatment — cast-in thin brick cladding, architecturally finished shearwalls presenting a colonnade appearance, and the transparent glass stair towers — creates a facility that enhances the campus aesthetic while clearly communicating its civic and institutional purpose.

 

Project Team

Precast Producer

Nitterhouse Concrete Products

Structural/Parking Consultant

Tim Haahs & Associates Consulting

Key Project Attributes

• Campus master plan integration — structure designed as part of a comprehensive hospital campus improvement strategy
• LEED-contributing sustainable design: fly ash concrete, regional materials, and Low-E glazed stair tower glass
• Pedestrian bridge connection directly linking parking to the medical facility
• Cast-in thin brick façade harmonizes with the hospital campus architectural vocabulary
• Architecturally finished shearwalls provide a solid colonnade appearance at the perimeter
• 440-space patient parking facility with 130,966 SF of precast components on a constrained campus site

Project/Precast Scope

  • 3 Levels
  • 440 Parking Spaces
  • 130,966 SF of Precast Concrete Components: Double Tees 130,966 SF, Beams 753 LF, Columns 931 LF, Prestressed Panels 6,486 SF, Horizontal Litewalls 11,329 SF, Shearwalls 3,293 SF, Stair Panels 8,239 SF
  • 12 Stair Units