Owner:
Jackson Memorial Health Systems, Miami, Fla.
PCI-Certified Precast Concrete Producer: 
GATE Precast Company, Kissimmee, Fla.
Architect:
Perkins&Will, Coral Gables, Fla. 
Precast Concrete Specialty Engineer: 
GATE Precast Company, Little Rock, Ark.
Engineer of Record:
Bliss & Nyitray, Miami, Fla.
General Contractor:
Yates Construction, Miami, Fla. 
PCI-Certified Erector:
Bass Precast Erecting Inc., Cleveland, Ga.
Project Cost: 
$155 million ($6.62 million for the precast concrete)
Project Size: 
605,000 ft² (64,000 ft² of precast concrete)Key Project Attributes 
    - The José Milton Memorial Hospital at Jackson West Medical Center consists of a 285,000 ft² hospital facility and a 320,000 ft², 875-car parking facility. 
 
    - Spanning six stories, the hospital functions as a civic and community gathering place and features advanced diagnostic and treatment areas, state-of-the-art surgical facilities, an integrated ambulatory care clinic, and more.
 
 Project/Precast Scope 
    - The project used 64,000 ft² of precast concrete, including 318 specially shaped precast and prestressed concrete rib panels, 246 pieces of precast concrete coping, 78 flat wall panels, 7 ribbed wall panels, and 2 spandrels. 
 
    - The hospital’s facade changes dramatically throughout its elevation, creating a sweeping aesthetic. 
 
    - Precast concrete engineering and detailing was completed between November 2017 and April 2019, with production occurring between January and June 2019.
 
  |