There was a problem loading this area.
Awards 
2024 PCI Design AwardsBest Healthcare/Medical Building
Project Team

Owner:

Emory Healthcare, Atlanta, Ga.

PCI-Certified Precast Concrete Producer:

GATE Precast Company, Monroeville, Ala.

Architect:

HKS, Atlanta, Ga.

Precast Concrete Specialty Engineer:

InfraStructure, LLC, Omaha, Neb.

Engineer of Record:

Uzun + Case, Atlanta, Ga.

General Contractor:

Brasfield & Gorrie, Atlanta, Ga.

PCI-Certified Erector:

Precision Stone Setting Company, Hiram, Ga.

Project Cost:

$90.34 million ($1.97 million for the precast concrete)

Project Size:

180,000 ft² (35,000 ft² of precast concrete)

Key Project Attributes

  • Emory Musculoskeletal Institute is a six-story, 180,000 ft² facility that provides exceptional clinical care, innovative research, and an enhanced experience for patients seeking care for bones, joints, and connective tissues..
  • Thanks to the use of precast concrete and other building materials, the project meets LEED Gold standards.

Project/Precast Scope

  • Precast concrete’s economic qualities allowed for a cost-effective, yet long-term solution to support Emory Musculoskeletal Institute and its patients for the long-term.
  • Natural limestone, simulated honed, medium-abrasive blast, and light-abrasive blast finishes were applied to the 35,000 ft² of precast concrete panels to achieve the intended design aesthetic.
  • Curved precast panels provide structural fluidity that mimics the human body. Some of these panels span more than 11 ft in width.