The following standard requirements in MNL 116-21 and MNL 117-13 have been revised.
MNL 116-21 Addendum
Modify Section 1.3.1, Personnel - General
(Add the requirement shown below to section 1.3.1.)
For plants that use SCC, at least one individual involved in the testing of fresh SCC or directing such tests shall maintain a current ACI Self-Consolidating Concrete Testing Technician certification or PCI-approved equivalent certification.
Revise Section 6.2.1, Testing - General
(Remove the two paragraphs shown below from section 6.2.1 and replace them with the alternate text that follows. The balance of this section remains unchanged.)
Individuals who perform aggregate gradation tests, fresh concrete tests, or concrete cylinder strength tests for acceptance shall meet the technician requirements of Practice C1077 or receive in-house training that includes, after a reasonable time period, an examination requiring a performance demonstration that is evaluated and documented by an independent examiner not in the employ of the plant or by a professional engineer. This documented training shall be renewed every five years.
At least one individual involved in the testing of fresh concrete or directing such tests shall maintain a current ACI Concrete Field Testing Technician – Grade 1 certification or PCI-approved equivalent certification. Individuals who perform fresh concrete testing without ACI Concrete Field Testing Technician – Grade 1 certification shall receive in-house training that includes, after a reasonable time period, an examination requiring a performance demonstration that is evaluated and documented by an independent examiner not in the employ of the plant. This documented training shall be renewed every five years.
Individuals who perform aggregate gradation tests or concrete cylinder strength tests for acceptance without ACI Aggregate Testing Technician – Level I, ACI Concrete Strength Testing Technician, or ACI Laboratory Testing Technician – Level I certification, as appropriate to their duties, shall receive in-house training that includes an examination requiring a performance demonstration of their ability to properly perform the tests before they are allowed to perform the test independently.
At least one individual involved in the testing of fresh concrete or directing such tests shall maintain a current ACI Concrete Field Testing Technician – Grade 1 certification or PCI-approved equivalent certification. For plants that use SCC, at least one individual involved in the testing of fresh SCC or directing such tests shall maintain a current ACI Self-Consolidating Concrete Testing Technician certification or PCI-approved equivalent certification. Individuals who perform fresh concrete testing for acceptance without ACI Concrete Field Testing Technician – Grade 1 certification or Self-Consolidating Concrete Testing Technician certification, as appropriate to the type of concrete being tested, shall receive in-house training that includes an examination requiring a performance demonstration of their ability to properly perform the tests before they are allowed to perform the test independently.
The performance demonstrations shall be evaluated and documented by one of the following:
- an individual certified in accordance with ASTM C1077 in the appropriate group of testing
- a professional engineer
- an examiner not in the employ of the plant who is competent by reason of training, experience, or certification in the test(s) being evaluated
This documented performance demonstration shall be renewed every five years.
Documentation of the performance demonstration must include:
- Name of technician
- Date of demonstration
- Location of test
- Identification of the test or practice demonstrated
- Listing of the significant steps in the practice or test method
- Whether the demonstration was passed
- Name, signature, and qualifications of examiner
MNL 117-13 Addendum
Modify Section 1.3.1, Personnel - General
(Add the requirement shown below to section 1.3.1.)
For plants that use SCC, at least one individual involved in the testing of fresh SCC or directing such tests shall maintain a current ACI Self-Consolidating Concrete Testing Technician certification or PCI-approved equivalent certification.
Revise Section 6.2.1, Testing - General
(Remove the paragraph shown below from section 6.2.1 and replace it with the alternate text that follows. The balance of this section remains unchanged.)
At least one individual involved in the testing of fresh concrete or directing such tests shall maintain a current ACI Field Testing Technician, Grade 1, certification or approved equivalent certification.
Individuals who perform aggregate gradation tests or concrete cylinder strength tests for acceptance without ACI Aggregate Testing Technician – Level I, ACI Concrete Strength Testing Technician, or ACI Laboratory Testing Technician – Level I certification, as appropriate to their duties, shall receive in-house training that includes an examination requiring a performance demonstration of their ability to properly perform the tests before they are allowed to perform the test independently.
At least one individual involved in the testing of fresh concrete or directing such tests shall maintain a current ACI Concrete Field Testing Technician – Grade 1 certification or PCI-approved equivalent certification. For plants that use SCC, at least one individual involved in the testing of fresh SCC or directing such tests shall maintain a current ACI Self-Consolidating Concrete Testing Technician certification or PCI-approved equivalent certification. Individuals who perform fresh concrete testing for acceptance without ACI Concrete Field Testing Technician – Grade 1 certification or Self-Consolidating Concrete Testing Technician certification, as appropriate to the concrete being tested, shall receive in-house training that includes an examination requiring a performance demonstration of their ability to properly perform the tests before they are allowed to perform the test independently.
The performance demonstrations shall be evaluated and documented by one of the following:
- an individual certified in accordance with ASTM C1077 in the appropriate group of testing
- a professional engineer
- an examiner not in the employ of the plant who is competent by reason of training, experience, or certification in the test(s) being evaluated
This documented performance demonstration shall be renewed every five years.
Documentation of the performance demonstration must include:
- Name of technician
- Date of demonstration
- Location of test
- Identification of the test or practice demonstrated
- Listing of the significant steps in the practice or test method
- Whether the demonstration was passed
- Name, signature, and qualifications of examiner
Approved: 01/28/2026
Effective: 01/01/2027