There was a problem loading this area.
Project Team

Owner:

City of Reno

PCI-Certified Precast Concrete Producer:  

CTU Precast

Architect:

Van Woert Bigotti Architects

Engineer:

Shields Engineering, Inc.

General Contractor:

Core Construction

Key Project Attributes

Key Project Attributes

  • Speed of Construction - Precast concrete installed in 10 days
  • Thermal Performance - Climate control
  • Insulated precast concrete wall panels
  • Architectural appeal through varying pattern and vertical reveals
  • CMAR project delivery

Project/Precast Scope

Project/Precast Scope

  • 16,000 SF insulated wall panels - exterior cladding