In 2020, the northern Minnesota communities of Virginia and Eveleth-Gilbert recognized a shared desire to elevate education quality for future generations and took the bold step to consolidate into the new Rock Ridge School District. A new Rock Ridge High School was a product of that collaboration and consolidation. At the center of school life in the new high school, a multi-story Innovation Commons connects all three building levels, establishing an open, cohesive atmosphere. The design embraces and reflects the region’s geological nature while mimicking the color and texture of the local rock outcroppings. The local community supports not only the school’s amazing educational opportunities, but investment from local industries and businesses also supports three gyms, a community pool, and a performing arts center. The nearly 300,000 square foot structure is a combination of precast walls and floor plank, steel framing, cmu bearing walls, and metal stud infill. Exterior finishes are architectural precast concrete, brick, and metal panels. Precast was chosen for this project because:
Key Project Attributes
Project/Precast Scope