Skip to main content
PCI Illinois Wisconsin
Sign In
312.505.1858
Toggle search
Search
Toggle navigation
Search
PCI of Illinois/Wisconsin
Loading
Company
_
iMIS Id
Image _ Count
Our Lady of Grace Catholic Church
Edina, MN - 2022
255215
33
❮
❯
Loading
Proj Overview
Our Lady of Grace has served the Edina, MN community for three-quarters of a century, and Gage Brothers’ meticulous work on the Catholic church’s $16.8 million expansion and renovation will help it thrive for another 75 years.
Opus Design Build chose precast concrete to take advantage of its time saving efficiencies and the assurance that each meticulously crafted panel
would accurately match the 20-acre campus’ blend of classical and Georgian architecture. Gage Brothers crafted nearly 37,000 square feet of 12-inch insulated brick-face precast concrete panels for the project, adding classrooms, meeting rooms, a preschool and a new Parish Activity Center complete with a full-size gym, theater and locker rooms.
Gage Brothers’ intricate precast mockups incorporated key elements and brick details for the structure’s window openings and sills, false openings and lettering castings, adorning the facade with recessed-brick rowlocks after each group of six. Crews ensured that the architect-selected Endicott
Thin Brick’s three-color blend accurately matched the campus’ existing structures.
Through creativity and professionalism, the precaster’s engineers overcame several design challenges to provide added value.
One section of the project that houses classrooms and bathrooms and abuts the gym doubles as a storm shelter. The windows’ large openings, spandrel panels and vertical elements between the windows required crews to resolve uplift loads and sizable shear loads to ensure the section
can withstand 250 mile-per-hour winds.
Near project completion, the owner requested additional medallions to be added to existing set panels. Opus Design Build and Gage Brothers teams worked together to provide supplemental precast medallions placed near the height of the building structure, introducing further enriched character and embellishment.
Loading
Project Team
Architect:
The Opus Group
Engineer:
The Opus Group
Contractor:
The Opus Group
Owner:
Our Lady of Grace Catholic Church
Precaster:
Gage Brothers
Precast Specialty Engineer:
Gage Brothers
Thin Brick Manufacturer:
Endicott Thin Brick
Image Credits:
Brian Rotert, Cipher Imaging
Key Project Attributes
The addition includes a full-size gym, locker rooms, preschool, theater stage, and classroom and meeting spaces.
20-acre campus’ blends classical and Georgian architecture
Crews ensured that the architect-selected Endicott Thin Brick’s three-color blend accurately matched the campus’ existing structures.
Project/Precast Scope
Total Project Cost: $16.8 million
Total Precast: $2.7 million
175 precast pcs, (37,000 square feet) of 12” insulated panels with thin brick finish.
Loading
__
There are no records.
Share this Project
Share on Facebook
Share on X (Twitter)
Share on LinkedIn
Email
More options
Bookmarks
Google+
MySpace
Reddit
StumbleUpon
Tumblr
Yammer
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##