The owners selected a load bearing, insulated precast sandwich panel system as an integral part of the building’s design, to take advantage of the rapid construction, high durability and over-all cost effectiveness inherent with precast concrete systems. A total of 35,000 square feet of precast wall and hollowcore floor panels were utilized for the two structures. The precast panels took less than 2 weeks to erect, even with the challenges of erecting adjacent to elevated train tracks.