Mill Street Bridge
Epping, NH
Engineer/Owner: New Hampshire Dept. of Transportation
Precast Engineer: J.P. Carrara & Sons, Inc.
• 8-day bridge erection schedule
• Exceeded state DOT speed requirements
• 115 ft single-span structural solution
• Span range extended by 8,000 psi HPC and 0.6 in dia strand
• Proven improvement over CIP construction
Download the Project Brief (1,237 kb pdf)
|